<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
kempinski

Kempenski Hotel Marsa Malaz, Doha

Project Overview

Location

Doha, Qatar

Sector

Commercial

Client

Kempenski

Consultant

Arab Engineering Bureau

Contractor

CDC Construction Development Company

Channel Partner

AlRiyadh Trading & Contracting
Download case study as PDF

Marsa Malaz Kempinski, the first ultra-luxury hotel to open on Doha’s iconic Pearl Island, comprises 281 rooms, including 73 suites, two Presidential Suites and two Royal Suites.

The complex includes six restaurants, lounge café, bar, rooftop nightclub with large open-air terraces, as well as a pool restaurant, spa café and a health club with an indoor pool. The hotel also features a Grand Ballroom and seven meeting rooms. The island has a private beach and outdoor swimming pools, water sports facilities, yachts jetty, tennis courts and plush gardens and patios.

Specification

Crane FS Balancing Valves and a wide selection of General Valves and Strainers.

Related Projects
beirut
Medical
Clemenceau Medical Center CMC, Beirut

The new 158 bed hospital, will offer ‘under one roof’ a full range of medical services from inpatient to outpatient care.

DownloadRead Case Study
king-hussein
Commercial
King Hussein Business Park, Amman

One of the HVAC plant rooms at the complex serving 75 international & local companies.

DownloadRead Case Study
Sidra-Hospital
Medical
Sidra Hospital, Doha

A range of valves for a cutting edge hospital in Qatar

DownloadRead Case Study
egypt-skyline
Retail
Mall of Egypt

Crane FS has supplied a range of general valves to the Mall of Egypt, a five star complex which will include a ski dome.

Read Case Study
kempinski
Hotels & Leisure
Kempenski Hotel Marsa Malaz, Doha

Marsa Malaz Kempinski, the first ultra-luxury hotel to open on Doha’s iconic Pearl Island, comprises 281 rooms, including 73 suites, two Presidential Suites and two Royal Suites.

DownloadRead Case Study