<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
lusail-stadium

Lusail Stadium, Qatar

Project Overview

Location

Lusail City, Qatar

Sector

Leisure

Client

Supreme Committee for Delivery and Legacy

M&E Contractors

HBK Contracting & China Railway International Construction (CRCC)

M&E Consultant

HBK Engineering

Distributor

Al Riyadh Trading
Download case study as PDF

An imposing 80,000 seater stadium that will host the 2022 World Cup final.

 

Specification

Crane FS general valves including ball, gate, butterfly valves and strainers

Related Projects
riyadh-metro
Infrastructure
Riyadh Metro, Saudi Arabia

An ambitious metro scheme – first stage – to transport 1.1 million people daily around the city.

DownloadRead Case Study
king-hussein
Commercial
King Hussein Business Park, Amman

One of the HVAC plant rooms at the complex serving 75 international & local companies.

DownloadRead Case Study
Lyric
Leisure
Lyric Theatre

Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.

Read Case Study
beirut
Medical
Clemenceau Medical Center CMC, Beirut

The new 158 bed hospital, will offer ‘under one roof’ a full range of medical services from inpatient to outpatient care.

DownloadRead Case Study
middle-eastern-airline
Education
Middle Eastern Airline Training Facility, Beirut

Award-winning ‘green building’ provides training for pilots, flight attendants & staff members.

DownloadRead Case Study