The Rail House, Piccadilly Gate comprises 10 floors and 13,000 sqm of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers. The fully air-conditioned space underwent a £8 million pound refit making it a premier commercial address in the city of Manchester.
Fitted with fan coils and chilled beams, Crane Fluid System’s Dominator have been installed throughout the build. The Dominator is a compact prefabricated unit which combines essential control components and connecting pipework which is ready for a simple and fast on-site connection to the terminal units. The Dominator allows the facilities management team at Rail House to control and measure flow around the building and is ideal for flushing and isolation.
Related Projects
The facility includes 1200 student rooms and a 32 bed hotel.
An exciting project in the North West has utilised Crane Fluid Systems valves. The quality and stock availability were key in winning selection for the build.
Supplied DPCVs, helping to reduce energy consumption and save money for Kent County Council.
Crane FS’s DPZVs are selected for use on the radiator system of Thames Valley Police HQ F Block in Kidlington, Oxfordshire
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.