The Rail House, Piccadilly Gate comprises 10 floors and 13,000 sqm of contemporary office space in an area seen as the focus for the city’s growing professional, financial and public sector occupiers. The fully air-conditioned space underwent a £8 million pound refit making it a premier commercial address in the city of Manchester.
Fitted with fan coils and chilled beams, Crane Fluid System’s Dominator have been installed throughout the build. The Dominator is a compact prefabricated unit which combines essential control components and connecting pipework which is ready for a simple and fast on-site connection to the terminal units. The Dominator allows the facilities management team at Rail House to control and measure flow around the building and is ideal for flushing and isolation.
Related Projects
Crane Fluid Systems has supplied Dominator with PICV units for installation in the British Museum extension in Bloomsbury, London.
Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.
The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.