<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
headquarters-cs

Headquarters Business Park, Jeddah

Project Overview

Location

Jeddah, Saudi Arabia

Sector

Commercial

Client

Al-Dar Al-Khasa for Urban Development

M&E Consultant

Saudi Diyar

M&E Contractor

STS

Distributor

ARCOM
Download case study as PDF

Includes the 52 floor West Tower, rising 240m high with spectacular views of the city.

Specification

Crane FS gate, globe, check, strainers, ball, balancing and butterfly valves

Related Projects
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
beirut
Medical
Clemenceau Medical Center CMC, Beirut

The new 158 bed hospital, will offer ‘under one roof’ a full range of medical services from inpatient to outpatient care.

DownloadRead Case Study
serafi-mall
Mixed Development
Serafi Mall, Jeddah

A complex that comprises of a hotel, office space, shopping mall and a mosque, plus the country’s first IMAX theatre.

DownloadRead Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
fountain-views
Residential
Fountain Views Hotel & Residence, UAE

A high-rise complex that comprises luxury serviced apartments as well as an ‘Address’ branded hotel.

DownloadRead Case Study