Includes the 52 floor West Tower, rising 240m high with spectacular views of the city.
Specification
Crane FS gate, globe, check, strainers, ball, balancing and butterfly valves
Related Projects
The largest tertiary hospital in UAE – built as part of the Abu Dhabi Economic Vision 2030.
The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.
One of the HVAC plant rooms at the complex serving 75 international & local companies.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
A high-rise complex that comprises luxury serviced apartments as well as an ‘Address’ branded hotel.