<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
beirut

ABC Verdun, Beirut

Project Overview

Location

Beirut, Lebanon 

Sector

Leisure

Consultant

Khatib & Alami

Mep Contractor

E.M Technology

Channel Partner

 MK Mustafa Ahmed Knio
Download case study as PDF

A $300M development, comprising a 10,000m2 ABC department store as well as housing 6,000m2 of entertainment & leisure facilities and 1,800 m2 of garden space, fronted by boutique retailers and cafe seating.

Specification

Iron pipe fittings, balancing valves plus a wide selection of general valves & strainers.

Related Projects
headquarters-cs
Commercial
Headquarters Business Park, Jeddah

Includes the 52 floor West Tower, rising 240m high with spectacular views of the city.

DownloadRead Case Study
dr-sulaiman
Medical
Dr. Sulaiman Al-Habib Hospital, Al Khobar

Offering a cutting edge virtual healthcare system – ‘Cyber Care’ will provide diagnostic & therapeutic services.

DownloadRead Case Study
Al-Salam-Hospitall
Medical
Al Salam Hospital, Al Khobar

A 496 bed hi-tech hospital, which caters for a range of medical care complete with a helipad.

DownloadRead Case Study
Lyric
Leisure
Lyric Theatre

Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.

Read Case Study
Tate-Modern-case
Leisure
Tate Modern Project

Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.

Read Case Study