<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
beirut

ABC Verdun, Beirut

Project Overview

Location

Beirut, Lebanon 

Sector

Leisure

Consultant

Khatib & Alami

Mep Contractor

E.M Technology

Channel Partner

 MK Mustafa Ahmed Knio
Download case study as PDF

A $300M development, comprising a 10,000m2 ABC department store as well as housing 6,000m2 of entertainment & leisure facilities and 1,800 m2 of garden space, fronted by boutique retailers and cafe seating.

Specification

Iron pipe fittings, balancing valves plus a wide selection of general valves & strainers.

Related Projects
akh-tower
Commercial
AKH Tower, Dammam

The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.

DownloadRead Case Study
Lyric
Leisure
Lyric Theatre

Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.

Read Case Study
Steigenberger Hotel Cairo
Hotels & Leisure
Steigenberger Hotel, Cairo

295 modernly furnished rooms and suites and on-site parking facilities. Meeting rooms are efficiently spread over one floor with a main multi-purpose hall able to take up to 300 guests.

DownloadRead Case Study
battoyor-tower
Residential
Battoyor Tower BHC, Dammam

High rise – primarily residential building with some floors designated for business use.

DownloadRead Case Study
lusail-stadium
Leisure
Lusail Stadium, Qatar

An imposing 80,000 seater stadium that will host the 2022 World Cup final.

DownloadRead Case Study