<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
beirut

ABC Verdun, Beirut

Project Overview

Location

Beirut, Lebanon 

Sector

Leisure

Consultant

Khatib & Alami

Mep Contractor

E.M Technology

Channel Partner

 MK Mustafa Ahmed Knio
Download case study as PDF

A $300M development, comprising a 10,000m2 ABC department store as well as housing 6,000m2 of entertainment & leisure facilities and 1,800 m2 of garden space, fronted by boutique retailers and cafe seating.

Specification

Iron pipe fittings, balancing valves plus a wide selection of general valves & strainers.

Related Projects
riyadh-metro
Infrastructure
Riyadh Metro, Saudi Arabia

An ambitious metro scheme – first stage – to transport 1.1 million people daily around the city.

DownloadRead Case Study
Steigenberger Hotel Cairo
Hotels & Leisure
Steigenberger Hotel, Cairo

295 modernly furnished rooms and suites and on-site parking facilities. Meeting rooms are efficiently spread over one floor with a main multi-purpose hall able to take up to 300 guests.

DownloadRead Case Study
beirut
Medical
Clemenceau Medical Center CMC, Beirut

The new 158 bed hospital, will offer ‘under one roof’ a full range of medical services from inpatient to outpatient care.

DownloadRead Case Study
Tate-Modern-case
Leisure
Tate Modern Project

Supplied Dominators and a selection of General Valves to the new extension at the Tate Modern, situated on the banks of the River Thames, London.

Read Case Study
ritz-carlton
Leisure
The Ritz-Carlton, Jordan

A luxury hotel comprising 228 guest rooms, 34 of which are spacious suites.

DownloadRead Case Study