Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.
The new £16.5 million building is changing the landscape of Hammersmith with a new drama, dance, film and TV recording studios; a 60-seat cinema; and a new bar and café.
As well as this large extension to the west of the theatre, the existing building will undergo its first major facelift in 30 years.
The Lyric is aiming to become one of the most sustainable cultural buildings in London with a green roof, almost 100 per cent LED lighting and reclaimed furniture.
Related Projects
Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
Crane FS has provided Dominator with PICV units to Spring Mews, Vauxhall, London.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.