<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
one-blackfriars

One Blackfriars Tower, London

Project Overview

Location

London, United Kindom

Sector

Mixed Development

Client

St George

M&E Consultant

Hoare Lea

M&E Contractor

Designer Group UK

Distributor

BSS
Download case study as PDF

Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.

Specification

Crane FS Balancing valves including DPCV, general and public health valves

Related Projects
skinners
Education
The Skinner’s Kent Academy

Supplied DPCVs, helping to reduce energy consumption and save money for Kent County Council.

Read Case Study
crane2137
Commercial
Wenlock Works

Crane Fluid Systems have supplied Dominator Peak Pro manifold assemblies to Wenlock Works, a major refurbishment in Shepherdess Walk, Shoreditch, London N1.

DownloadRead Case Study
9-elms
Mixed Development
Nine Elms, London

A modern mixed-use project, using Crane FS’ Dominator Peak Pro

DownloadRead Case Study
5-broadgate
Financial
5 Broadgate

Crane Fluid Systems has supplied thousands of valves for the core and shell build of 5 Broadgate, located in London’s Square Mile.

Read Case Study
serafi-mall
Mixed Development
Serafi Mall, Jeddah

A complex that comprises of a hotel, office space, shopping mall and a mosque, plus the country’s first IMAX theatre.

DownloadRead Case Study