Informally known as ‘The Vase’, the development is made up of a 52-storey tower and two smaller buildings for flats, a hotel and retail.
Specification
Crane FS Balancing valves including DPCV, general and public health valves
Related Projects
Commercial
Star House, Maidenhead
The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.
Infrastructure
Great Blakenham Energy from Waste Facility
The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.
Commercial
Almack House, London
Crane Fluid Systems’ Dominator Eco & Modbus Actuator used for the Almack House Refurbishment
Leisure
Lyric Theatre
Crane Fluid Systems provided a range of General Valves to the extension of The Lyric Hammersmith Theatre in London.