The QRail Doha scheme consists of a 300-kilometre metro network with four lines (red, gold, green & blue) with 80 stations; and light rail networks serving residential developments, such as Lusail, Education City and West Bay.
The Lusail LRT (Light Rail) project consists of four lines totalling 30km, 8 underground stations and 25 at-grade stations. Raed Line North will extend approximately 13 km northward from Musherib station, and has 7 underground stations.
Two parallel tunnels will be excavated for a length of about 11.6 km and an internal diameter of 6.17 metres. Red Line South has 12 km long underground sections between Doha City Centre and the Airport. Green Line, has 15 km long underground sections which run north-south through the city.
An over-ground extension to the underground tunnel section will have a total length of 3.2 km, of which 2.7 km will be a bridge from prefabricated components.
Related Projects
Offering a cutting edge virtual healthcare system – ‘Cyber Care’ will provide diagnostic & therapeutic services.
Includes the 52 floor West Tower, rising 240m high with spectacular views of the city.
A range of Crane FS valve types were specified and installed in the Qatar stadiums
The 37-story high rise is the new headquarters for Al Abdul Karim Holding (AKH), a major wholesale distributor.
A high-rise complex that comprises luxury serviced apartments as well as an ‘Address’ branded hotel.