St Barts Hospital, London

Project Overview

Location

London, UK

Consultant

STW Architects

Main Contractor

Kier

Client

Nuffield Health

Channel Partner

Wolseley Bristol

M&E Contractor

Integral

Specification

Crane FS Peak Pro Dominators
Download case study as PDF

Crane Fluid Systems is supplying 300 Peak Pro Dominators to London’s oldest hospital, St Bartholomew’s in the City of London, which is undergoing an extensive modernization of the existing pathology unit and residential staff quarters, to provide a new private hospital for Nuffield Health.

The main contractor is Kier, and Crane FS is working in close partnership with Integral a UK M&E specialist service provider supplying 40mm Dominators for direct connection to fan coil units (FCUs) and 80mm Z9601PF Dominator’s for other terminal units, including chilled beams.These units come complete with integrated PICV and actuator, strainer, flow measurement device and flushing drains. All the valves are pressure tested in accordance with BS EN 12266-1 as well as having a flow limitation test meeting BSRIA standards as per BTS 01.

The final fully assembled manifolds are manufactured in the UK and each one is individually factory tested to ensure the unit meets specification and ensures reduced installation times on site. The 40mm Dominators are being assembled into FCUs by Quartz, with Crane FS working closely alongside Integral to ensure that the proposed units meet the requirements from the designer and provide the greatest energy efficiency and shortest commissioning times possible.

The new £60M facility is scheduled to open in the Spring of 2021 and will have 48 bedrooms, 4 state of the art operating theatres and 28 consultation rooms and will specialize in cardiology, cardiac surgery, oncology, and orthopaedics. The building will also provide physiotherapy and diagnostics, as well as in patient and out-patient services.

Published: 2020
Related Projects
9-elms
Mixed Development
Nine Elms, London

A modern mixed-use project, using Crane FS’ Dominator Peak Pro

DownloadRead Case Study
cleveland-clinic
Medical
Cleveland Clinic, Abu Dhabi

The ‘state of the art’ hospital has a maximum capacity of 490 beds including floors for clinical and diagnostic work plus 13 floors for critical and acute inpatients.

DownloadRead Case Study
star-house
Commercial
Star House, Maidenhead

The new Crane Fluid Systems Dominator Eco has been selected as part of the £40M refurbishment of Star House (Project Tempo) in Maidenhead for Legal & General.

Read Case Study
great-blakenham
Infrastructure
Great Blakenham Energy from Waste Facility

The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.

Read Case Study
first-street
Arts
First Street Cultural Centre

Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.

Read Case Study