Dominator Z3000 flow management combination valve units from Crane Fluid Systems were installed in a 60,000 sq ft office development, the centerpiece building within a£55m mixed development known as Trinity Gardens in Newcastle-Upon-Tyne.
Specification
Crane FS Dominator valves.
Related Projects
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Delta T Services for the new four-pipe fan coil air conditioning system of Chaplin House in Uxbridge, London.
The Energy from Waste Facility at Great Blakenham, Suffolk will receive and incinerate waste to create energy from homes all over the country.
Crane FS balancing valves and a wide selection of general valves and strainers were specified throughout this prestigious resort.
Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.
Providing PICV valves to the construction of the Manchester’s new arts centre and cultural quarter, First Street.