<<<<<<< HEAD ======= >>>>>>> T98332-embodied-carbon-form
Our genius is valves ®
trinity-gardens-newcastle

Trinity Gardens, Newcastle Upon Tyne

Project Overview

Location

Newcastle-Upon-Tyne, United Kingdom

Sector

Mixed Development

M&E Contractor

Norstead
Download case study as PDF

Dominator Z3000 flow management combination valve units from Crane Fluid Systems were installed in a 60,000 sq ft office development, the centerpiece building within a£55m mixed development known as Trinity Gardens in Newcastle-Upon-Tyne.

Specification

Crane FS Dominator valves.

Related Projects
serafi-mall
Mixed Development
Serafi Mall, Jeddah

A complex that comprises of a hotel, office space, shopping mall and a mosque, plus the country’s first IMAX theatre.

DownloadRead Case Study
HanoverSquare4
Mixed Development
Hanover Square

Crane Fluid Systems Dominator Peak Pro manifold assemblies have been selected by M&E contractor Michael J Lonsdale Ltd. for the heating and air conditioning system of the Hanover Square development in Mayfair, London.

Read Case Study
uni-glasgow
Education
University of Glasgow Gilmorehill Campus

A learning & teaching hub consisting of two large lecture theatres that can be configured together as one 800-seater.

DownloadRead Case Study
Crossrail
Retail
Crossrail Shopping Centre

Crane Fluid Systems have supplied Butterfly Valves, Cast Iron DRVs, Strainer & Check Valves to Canary Wharf Contractors (Crossrail) Limited, for the Crossrail shopping centre.

Read Case Study
9-elms
Mixed Development
Nine Elms, London

A modern mixed-use project, using Crane FS’ Dominator Peak Pro

DownloadRead Case Study